Duro-Last

 

Duro-LastDuro-Last began in 1978 with the simple need to find a roofing system that worked. Existing roofing systems presented a common problem – they required ongoing maintenance and continual expense, with no long-term solution in sight.

To solve this problem Duro-Last designs, and assembles, their roofing system using an “in-house” developing custom prefabrication methods and specialized equipment that allows them to complete nearly 100% of the difficult roof details and up to 85% of field seams under ideal factory controlled conditions. The result is lower on-site labor costs and better installation quality.

Duro-Last is now the world’s largest manufacturer of prefabricated roofing systems. The Duro-Last Roofing System, contractor installation team, customer service and warranty all set the quality standards for the roofing industry. The custom-fabricated, single-ply Duro-Last roofing system is ideal for any flat or low-sloped application.  Extremely durable and easily installed by authorized contractors without disrupting building operations, the Duro-Last roofing system is also watertight, highly reflective, resistant to chemicals, fire and high winds, and virtually maintenance-free. Duro-Last is strong and resilient to degradation giving it a long life and a warranty of 10, 15, 0r even 20 years. Duro-Last is also manufactured is many different colors to help fit the color scheme and look of your home or place of business.