![First Presbyterian Church](http://www.diesslinstructures.com/wp-content/uploads/2014/07/IMG_4789-e1406213788833.jpg)
![First Presbyterian Church](http://www.diesslinstructures.com/wp-content/uploads/2014/07/First-Pres-5-e1406214240939.jpg)
![First Presbyterian Church](http://www.diesslinstructures.com/wp-content/uploads/2014/06/100_4511-e1402945974541.jpg)
![First Presbyterian Church](http://www.diesslinstructures.com/wp-content/uploads/2014/07/First-Pres-7-e1406214300646.jpg)
![First Presbyterian Church](http://www.diesslinstructures.com/wp-content/uploads/2014/07/First-Pres-9-e1406214183889.jpg)
![First Presbyterian Church](http://www.diesslinstructures.com/wp-content/uploads/2014/07/First-Pres-10-e1406214192516.jpg)
This beautiful new place of worship includes a 250 seat sanctuary, an entrance and large foyer for large quantities of guests, a narthex, a fellowship area, offices for staff, a nursery, elevator and lift, as well as bathroom and shower facilities. The current sanctuary, kitchen and offices have been reconfigured for use in different areas of the project.
- Owner: First Presbyterian Church of Salida
- Engineer: Barcus Structural Engineering
- Architect: Ron Mazzeo Architect, LLC
- Location: Salida, Colorado
- Final Construction Cost: $1,107,818.00
- Completion Date: April 24, 2014